Pre-Drilling Checks
Gather additional electrical locating information before planned drilling.
Help identify and trace suitable energized electrical cables before drilling, cutting, coring or opening concrete and masonry surfaces.
Electrical services concealed within concrete and walls can create significant risk during invasive work. Where appropriate equipment, access and site conditions allow, live cable detection can supplement GPR and available electrical information to help identify likely energized cable routes.
Detection information should be considered together with electrical isolation procedures, available drawings, site documentation and applicable safety requirements before invasive work begins.
Gather additional electrical locating information before planned drilling.
Investigate concealed electrical services before forming wall openings.
Support planning where existing electrical service routes may be uncertain.
Add supplementary locating information before cutting suitable surfaces.
Assist with tracing suitable energized services where conditions permit.
Support planning for equipment, fixtures and new penetrations.
Live cable detection is a supplementary locating measure and does not guarantee identification of every energized conductor. Appropriate electrical isolation, verification, PPE and applicable safe-work procedures remain essential before drilling, cutting or demolition.
Detection effectiveness can vary with cable depth, conductor type, circuit condition, surrounding materials, shielding, surface accessibility and the locating technology used. Available drawings, panel information and other project documentation should also be considered.
The approach depends on the proposed work, available access, electrical conditions and the suitability of the locating equipment.
We review the planned work, available electrical information and accessible area.
Suitable locating methods are used across the agreed accessible work area.
Detected signals and relevant scan information are reviewed in the project context.
Agreed markings, locating information and/or project documentation are provided.
Share your project location, proposed work area and available electrical information and we'll help determine an appropriate locating scope.